posted on Oct, 14 2010 @ 05:34 AM
reply to post by StealthyKat
[atsimg]http://files.abovetopsecret.com/images/member/a22371d20af7.jpg[/atsimg]
This is one takes the cake in hole preparation for grouting. Thanks StealthKat for the post.
They dig up a hole “deep” into the subseabed, bury the injector head and cement it up. In a previous video, you see a circular whiter patch of
seabed with the cables sticking out at the edge. They needed to cement the hole to prevent the high pressured injection from coming up the dug hole.
The objective is to force the grout into the fissures and blocked the oil from seeping out.
Notice the coords are E 1,587, 889 N 10 431 568 (please check nos, not very clear) which plots 115 km to the east. But if you substitute the first
four digit (E 1,587) with (E 1,202) then the location of this “grouting hole” is just 98 feet E of Well A. See my article
bklim.newsvine.com...
on how BP adulterated the coordinates to fool the world.