It looks like you're using an Ad Blocker.
Please white-list or disable AboveTopSecret.com in your ad-blocking tool.
Thank you.
Some features of ATS will be disabled while you continue to use an ad-blocker.
According to documents from Tokyo Electric Power (Tepco), the company repeatedly missed safety checks over a 10-year period up to two weeks before the 11 March disaster, and allowed uranium fuel rods to pile up inside the 40-year-old facility.
When the plant was struck by a huge earthquake and tsunami, its reactors, designed by US scientists 50 years ago, contained the equivalent of almost six years of highly radioactive uranium fuel produced by the facility, according to a presentation Tepco gave to the International Atomic Energy Agency and later posted on the company's website.
When disaster struck earlier this month, the plant contained almost 4,000 uranium fuel assemblies kept in pools of circulating water – the equivalent of more than three times the amount of radioactive material usually kept in the active cores of the plant's reactors.
Originally posted by v1rtu0s0
According to documents from Tokyo Electric Power (Tepco), the company .... allowed uranium fuel rods to pile up inside the 40-year-old facility.
When disaster struck earlier this month, the plant contained almost 4,000 uranium fuel assemblies kept in pools of circulating water – the equivalent of more than three times the amount of radioactive material usually kept in the active cores of the plant's reactors.
Click here to read more.