It looks like you're using an Ad Blocker.

Please white-list or disable AboveTopSecret.com in your ad-blocking tool.

Thank you.

 

Some features of ATS will be disabled while you continue to use an ad-blocker.

 

NASA studies extending shuttle to 2015

page: 1
0

log in

join
share:

posted on Aug, 30 2008 @ 03:43 PM
link   

NASA studies extending shuttle to 2015


ap.google.com

NASA's staff will study whether the space shuttle program could continue operating past its scheduled retirement in 2010, according to an internal e-mail sent this week.

The e-mail obtained by The Orlando Sentinel describes NASA Administrator Michael Griffin's order for a study to determine if the shuttle could fly until 2015, when NASA's next-generation space platform is expected to be completed.
(visit the link for the full news article)



posted on Aug, 30 2008 @ 03:43 PM
link   
...alright, how about this one? With an 'election-year theme' no less -- from the article:


Republican presidential candidate John McCain was one of several senators asking NASA to delay ramping down the shuttle program for at least a year. Democratic nominee Barack Obama has called for $2 billion for NASA to extend the shuttle past 2010.



Griffin has repeatedly raised the issue of how much it would cost to keep the shuttle flying. Last year, he estimated it could cost $4 billion each year past 2010.

"Continuing to fly the Shuttle beyond 2010 does not enhance U.S. human spaceflight capability, but rather delays the time until a new capability exists and increases the total life cycle cost to bring the new capability on line," he told Congress in November.


ap.google.com
(visit the link for the full news article)

[edit on 30-8-2008 by arktkchr]



new topics
 
0

log in

join