posted on Dec, 4 2012 @ 11:23 PM
The primary structural assembly of the first flying prototype A350 has been completed. MSN1, minus engines, was moved to the final assembly line on
its own wheels for the first time. Electrical testing has been completed, hydraulic testing is coming up. After that, certification, and
installation of the engines. This is the first of five flight test aircraft, with first flight aimed at mid-2013.
www.flightglobal.com...