The Conspiratorial Mega Float
photo.tepco.co.jp...
- Purple Chive
SAN DIEGO (CN) - The Fukushima nuclear disaster exposed Navy rescue workers to dangerous levels of radiation, which the government-owned power plant covered up, eight U.S. sailors claim in court. Eight crew members of the U.S.S. Ronald Reagan, whose home port is San Diego, sued the Tokyo Electric Power Co. in Federal Court.
Regarding the spike in obesity in the 5- to 9-year-old group, an official of the education board said: "Parents, particularly those who have small children, were very concerned about possible radiation effects. They may have also restricted their children from playing outside at home."
Originally posted by MariaLida
Obesity rising for Fukushima kids / 5- to 9-year-olds show highest rates of obese children across the nation
Regarding the spike in obesity in the 5- to 9-year-old group, an official of the education board said: "Parents, particularly those who have small children, were very concerned about possible radiation effects. They may have also restricted their children from playing outside at home."
www.yomiuri.co.jp...

50.55×100mm (as of 11:00 , 12/27 )
28.20×100mm (as of 11:00 , 12/26 )
31.00×100mm (as of 11:00 , 12/25 )
We continuously monitor the water level of the Skimmer Surge Tank*, adding the appropriate amount of water to the pool, the amount which evaporates from the surface of the pool. We could detect any water leakage as an abnormal water level fall at the Skimmer Surge Tank*, should the pipes get damaged. Furthermore, the pool itself is equipped with water leak detectors that lie inside the gap between the reinforced concrete and the stainless steel plate.
Ensuring Reliability of the Offsite Power Supply of our Nuclear Power Stations
FUK-U-SHIMA: Japan's Nuclear Dead Zone Spreads Far And Wide - Tokyo Almost As Irradiated As Fukushima!
December 27, 2012 - JAPAN - We've documented the spread of radiation from Fukushima to Tokyo for a year and a half. Unfortunately, as the following recent headlines from Ene News show, things are only getting worse:
As the accumulated water transferred from Units 5-6 Turbine Buildings containing low level of radioactive materials is stored in the mega float, the accumulated water was transferred from the mega float to the temporary tanks installed near Units 5-6 on November 22 for the purpose of mitigating the risk of radioactive material leakage into the sea.
- At 10:00 AM on December 25, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
- At 10:00 AM on December 28, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 27, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 17, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 18, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 19, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 20, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 21, we started transferring the accumulated water in Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.
At 10:00 AM on December 14, we started transferring the accumulated water from Unit 6 Turbine Building basement to the temporary tank. At 3:00 PM on the same day, the transfer was stopped.




2012/12/30 0:00,0.008 ,2520
2012/12/30 4:00,0.008 ,2518
2012/12/30 5:00,0.008 ,2517
2012/12/30 6:00,0.008 ,2516
2012/12/30 7:00,0.008 ,2515
2012/12/30 8:00,0.008 ,2514
2012/12/30 9:00,0.008 ,2513
2012/12/30 10:00,0.008 ,2512
2012/12/30 11:00,0.008 ,2511