reply to post by airvicemarshal
I really liked your post, but I think you might be a little off with the date. I'm too lazy to do it manually so I found a website that calculates
911 days before 21/12/2012. This is what I found:
Duration calculation results
From and including: Thursday, June 24, 2010
To, but not including : Friday, December 21, 2012
It is 911 days from the start date to the end date, but not including the end date
Or 2 years, 5 months, 27 days excluding the end date
Date Duration Calculator
According to those calculations the big day is June 24th, 2010. Am I overlooking something?
ETA: Another interesting gap between dates is 9/11/2001 (9/11) and 3/11/2004 (Madrid bombings) which I had heard was exactly 911 days difference.
Using this calculator on this site though, it comes up as 912.
So not sure how reliable that is as a prediction method.
[edit on 18/6/2010 by Dark Ghost]