This is going to take me all year, i could do with some help if anybody is able to assist please u2u me.
Had to buy a decent paint package after work today, after i had bought it i wondered wtf am i doing, i only went to ATS to ask a golf question, anyway
dont laugh at my initial scribbles.
Shows a plan view of the concrete beams, the floor slab is supported by the beams, (columns support the beams, beams support the slab.)
The grey grid is the building to the left of the expansion joint when you view the building from the heliport area. The edge closest to the collapsed
area sits along grid line 11. Grid line 11 has columns which support the edge sitting closest to the collapsed area.
The black grid contains an area of the collapsed section sitting to the right of the expansion joint, viewed from the helipad. The edge closest to the
collapsed area Stops short of grid line 11. Anything short of grid line 11 has no columns which to support the beams/slab.